To avoid the noise emission to nearby buildings, as happened in Ibiza Rocks, Tafor Consulting guarantees the calculation of the optimum stage and loudspeakers location, avoiding noise impact to neighbours while maintaining a maximum sound level in the concert area, without altering the surrounding materials at all (without acoustic screens, with no building materials extra cost). To control the Concerts noise impact such as the Ibiza Rocks Hotel Concerts in Sant Antoni (Ibiza), we control the noise sources (sound power spectrum) and the surroundings, calculating the minimum acoustic noise attenuation reinforcement with barriers, and/or a sound limitation within the sound amplifying equipment.

Pablo Corrochano

Founder &

Head of Innovation

Carla Perez-Rosales

Co-Founder &

Head of Partnerships